Puddle
Member
I have a project where I've decided to put in a facility to change the PLC time and date through the HMI, as there's no network connection at the installation location.
My date/time edit is pretty much the same as in this document:
https://instrumentacionycontrol.net...9182145_S7-1200_HMI_time_sync_HowTo_e-min.pdf
It works great, except it will not allow me to input a date at all. Whatever I put in, the field turns into ##### and then goes back to zero (1970 for date/time, 1990 for just date).
I've tried splitting off to use seperate fields for time and date and found the time is accepted. I've tried using I/O fields to input the year, month and day seperately and this doesn't work either. I've tried every variety of dd.mm.yyyy that I can think of (HMI language setting is d/m/yyyy) and I've created a new DTL tag that's not assigned anywhere in the project.
Same result using I/O fields and date/time fields. Always using input/output setting.
My date/time edit is pretty much the same as in this document:
https://instrumentacionycontrol.net...9182145_S7-1200_HMI_time_sync_HowTo_e-min.pdf
It works great, except it will not allow me to input a date at all. Whatever I put in, the field turns into ##### and then goes back to zero (1970 for date/time, 1990 for just date).
I've tried splitting off to use seperate fields for time and date and found the time is accepted. I've tried using I/O fields to input the year, month and day seperately and this doesn't work either. I've tried every variety of dd.mm.yyyy that I can think of (HMI language setting is d/m/yyyy) and I've created a new DTL tag that's not assigned anywhere in the project.
Same result using I/O fields and date/time fields. Always using input/output setting.